iTWO for A/E/C


5D BIM Project Delivery Enterprise Platform

iTWO for A/E/C

 

Cutting edge 5D planning and execution

With general construction, productivity is the chief goal. Many solutions offer a look into material cost, but iTWO delivers a collaborative platform that reveals estimation, progress, and forecasting all in one. General contractors can assign labor more efficiently, and save significant time through virtual planning. With iTWO, owners are able to use benchmarking to see where they’ve been and the exact steps that need to be taken to improve performance in the future.  

  • Increase Bid & Estimate Accuracy

  • Mitigate Cost and Schedule Risks

  • Visualize & Analyze Project Performance

  • Save Time Collecting & Reporting Project Performance

  • Make Accurate Predictions of Cost & Schedule

  • Flexibility in Forecasting

  • Integrated Project and Financial Forecasting

 

3D model

Save time

Early Warning

Thanks to the 3D model, iTWO can extract the quantities based upon the design to enhance the estimating process, improve the benchmarking validation and enable values for engineering options to be undertaken in time with the design changes.

Time gained due to the synergy of integrating the 3D design to cost and time will significantly enhance and enrich the data sets of the project for all the professional disciplines involved. Initial analysis by construction customers suggest savings in time and cost potentially of up to 30%.
 

Early warning of design errors before building begins through clash detection. This will enable the commercial team to validate the design process prior to commencement on site and seek early resolution to variation and changes.

Quantities

Risk reduction

Change Mgmt.

Quantities can be tracked in line within the design plan and actually be delivered on site for increased control and performance monitoring over the life cycle.

iTWO makes managing complex projects more transparent and more secure. Risk reduction can be achieved by integrating planning and design decisions within iTWO. 

Changes to the building procedure and the resulting changes to costs and deadlines can be easily and clearly performed on the model.

Virtual = Physical

Using RIB iTWO you can simulate different design variables, calculation processes and execution variables, which precisely follow, control and minimize the risk profile by selecting and deselecting variables virtually before construction starts. The result of the process is significant with reduction of up to 80% in change orders, a more stringent cost profile and totally minimized risk.


Call +1 (800) 225-5622

Hear how iTWO can create value in your construction project