iTWO for Power

 

Cutting edge 5D planning and execution

Power related construction is among the most unique in the industry – Construction for power generation, transmission and distribution requires skills and knowledge that’s becoming harder and harder to find.  iTWO is designed to achieve project continuity and centralized data retention to help teams transition knowledge from one project to the next.   

  • Measure off the model-3D Scoping (optional)

  • Establish a Reliable Project Budget

  • Integrate scope, cost, and schedule with ease

  • Project visualization makes each role more efficient

  • Manage risk, opportunities, and contingency

  • Capture knowledge and apply it to your next project

  • More time and resources for PLM

 

3d model


Thanks to the 3D model, iTWO can extract the quantities based upon the design to enhance the estimating process, improve the benchmarking validation and enable values for engineering options to be undertaken in time with the design changes.

save time


Time gained due to the synergy of integrating the 3D design to cost and time will significantly enhance and enrich the data sets of the project for all the professional disciplines involved. Initial analysis by construction customers suggest savings in time and cost potentially of up to 30%.
 

early warning


Early warning of design errors before building begins through clash detection. This will enable the commercial team to validate the design process prior to commencement on site and seek early resolution to variation and changes.

quantities


risk reduction


change mgmt


Quantities can be tracked in line within the design plan and actually be delivered on site for increased control and performance monitoring over the life cycle.

iTWO makes managing complex projects more transparent and more secure. Risk reduction can be achieved by integrating planning and design decisions within iTWO. 

Changes to the building procedure and the resulting changes to costs and deadlines can be easily and clearly performed on the model.

 

Virtual = Physical

Using RIB iTWO you can simulate different design variables, calculation processes and execution variables, which precisely follow, control and minimize the risk profile by selecting and deselecting variables virtually before construction starts. The result of the process is significant with reduction of up to 80% in change orders, a more stringent cost profile and totally minimized risk.


Call +1 (800) 225-5622

Hear how iTWO can create value in your construction project